Category: Calibration
-
PB8 calibration using geostationary satellites
We know that pb8 is not pointing exactly in the right position (see EME experiment at 5GHZ, October 11) We started this week signal measurements at 5GHz using geostationary satellite. The protocol is as follows: Lock (manually) pb8 on the maximum of the received signal (beacon / channel). Keep track of the position given by…